|

Purpose Section
This procedure establishes the method used to issue and maintain CD's within
YCNH.
Another Sample Section (Product Documentation)
Engineering documentation contains information required for the construction of
YCNH product, and includes, but is not limited to blueprints, schematics, BOMs,
wiring diagrams, and drawings. This documentation is released from Document
Control and shall be under revision control.
QA documentation contains information required for the construction and testing
of YCNH product, and includes, but is not limited to other company procedures,
forms, lists, charts, signs, and Certificates.
Unapproved work instructions are prohibited especially when they are necessary to
create or test a product. If the information is required in order to
properly create or test a product, it must be approved and converted into a
controlled document. A work instruction is required if the absence of it will
cause a product quality problem and/or prevent assembly or test personnel from
performing their job.
Screen Shot
|
|