Ape Software
 login | free cd | downloads | map | contact us  
Ape Software Checkout
homeproductsiso 9000purchasecontact uslinks
Final Inspection Procedure
QS/ISO 9000/9001 Compliant
homeadd to cart ($19)

Purpose Section

This procedure establishes the methods used by YCNH inspectors to verify that items submitted for final inspection are acceptable for release to distribution.

Another Sample Section (Inspection Documentation)

End items flow to the final inspection station with the work order. Drawings and assembly instructions may also be attached to the work order as required by the specific requirements of the end item.

Inspection procedure are initiated, revised, and approved by Quality Assurance. The inspection procedure lists the parameters to which each end item will be inspected. Quality Assurance shall ensure that the inspection documentation is current at the appropriate inspection stations.

The work order is the record of manufacturing and inspection operations. Upon release for shipment, the work order and any appropriate history documentation is filed by Quality Assurance as a record of end item acceptability.

Screen Shot

Final Inspection Procedure

home : map : my admin : about us : our customers : contact us : privacy policy

© 1992-2005 Ape Software all rights reserved

Free Demo CD